Haier HWB100-B14858U1 handleiding
Handleiding
Je bekijkt pagina 8 van 36

8
2-Installation
EN
It is recommended to use an infrared level to detect groun
)
Considering the heat dissipation requirements of embedded machines, it is
recommended to reserve at least 2cm gap on both sides of the machine and at least
5cm gap on the top of the machine.
(1)
(2)
2-4
2-5
2-6
2-7
2.4 Aligning the appliance
Push in the device,Adjust all feet (Fig.2-5) to
achieve a complete level position. Thiswill
minimize vibrations and thus noise during use.
It will also reduce wear and tear. We recommend
to use a spirit level for adjustment.
Floor should be as stable and at as possible.
1. Loose the locknut (1) by using a wrench.
2. Adjust the high turning the foot (2).
3. Tighten locknut (1) against the housing.
Following connections are possible:
2.5.1 Drain hose to sink
Hang the drain hose with the U-support over
the edge of a sink with adequate size (Fig. 2-6).
ping.
2.5.2 Drain hose to waste water connection
The internal diameter of the stand pipe with
vent-hole must be minimum 40 mm.
Put the drain hose for 80-100 mm in the wast-
ewater pipe.
Attach the U-support and secure it su
ientl
(Fig. 2-7).
Bekijk gratis de handleiding van Haier HWB100-B14858U1, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Haier |
Model | HWB100-B14858U1 |
Categorie | Wasmachine |
Taal | Nederlands |
Grootte | 4745 MB |