Hager ESR1332004 handleiding
Handleiding
Je bekijkt pagina 41 van 308

39
Technical changes reserved
electraplan.UK
electraplan.UK
Installation instructions, universal junction boxes
Grounding underfloor box UDH
Connect the ground cable provided in the
universal junction box the supplying trunking
end to ensure electrical conductivity between
the two components. The ground cable in the
universal junction box must be connected to
the ground connection on site.
Install the screed Replace the protection lid
Install screed up to the top edge of the uni-
versal junction boxes. The protection lid only
serves as protection against ingress of for-
eign material and must not be rolled over or
subject to any other load.
Do not remove the protection lid until the
flooring is being installed, and replace it by
an fitting frame. Secure it to the box frame or
levelling frame using screws.
Install the service unit
After laying the flooring, cut out the openings
of the installed fitting frames and install the
service unit or cassette.
Bekijk gratis de handleiding van Hager ESR1332004, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Hager |
| Model | ESR1332004 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 89708 MB |
Caratteristiche Prodotto
| Kleur van het product | Oranje |
| Breedte | 45 mm |
| Diepte | 40 mm |
| Duurzaamheidscertificaten | RoHS |
| Aantal | 20 |







