Note:
This diagram is an example for customers who only want to build the on-grid energy
storage system without backup function. The N line must be connected.
Figure 5.24
5.4.3 Three meter wiring methods of SPH
The three meter wiring methods are demonstrated below:
1. Three phase meter-CHNT
485A
(LAN line 5 )
485B
( LAN line 1 )
Grid
Load
Figure 5.25
Note:
For details about meter installation, please refer to the meter installation guide delivered
with the machine.
E
SPH Inverter
AC GRID
Diagram C
2. Three phase meter-Eastron
485A
LAN line5
485B
LAN line1
Figure 5.26
3. Three phase CT meter-Eastron
26
25
Bekijk gratis de handleiding van Growatt SPH 4000-10000TL3 BH-UP, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Growatt |
| Model | SPH 4000-10000TL3 BH-UP |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 8645 MB |