Goodwe GW50K06-ETC handleiding
Handleiding
Je bekijkt pagina 35 van 74

31
06 Electrical Connection
User Manual V1.2-2024-10-30
ON-GRID
BACK-UP
BAT
PV
Meter
E-BAR
L3
N
PE
BMS
L3
L1
L2 L3
N
N
PE
PE
L3
L2
L2
L1
L1
N
PE
L3
L2
L2
L1
L1
N
PE
RCD
RCD
N
PE
or
Main Panel
Inverter
Battery
PV
string
BACK-UP
load
Normal loads
Utility
Grid
Meter
N and PE cables in the Main Panel shall be wired separately�
NOTICE
Ensure that the grounding of BACK-UP is correctly and tightened. Otherwise, the BACK-UP
function may be abnormal in case of grid failure.
Other areas except Australia, New Zealand etc., are applicable to the following wirings:
• In Germany, the internal relay will connect the N wire and PE cable
in back-up mode in 100ms. The internal relay will be disconnected in
ON-GRID mode.
• In areas other than Germany, the internal relay is disconnected by
default in either mode.
Detailed Wiring Diagram
For detailed wiring, please scan the QR code below or visit: https://en.goodwe.com/Ftp/EN/
Downloads/User%20Manual/GW_Commercial-Smart-Inverter-Solutions_Quick-Guide-ETC-BTC50-
100K-EN.pdf to view "ETC & BTC Series 50 kW - 100kW Hybrid & AC-coupled Inverter Solutions
Guide"
Bekijk gratis de handleiding van Goodwe GW50K06-ETC, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Goodwe |
| Model | GW50K06-ETC |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 8531 MB |