Goodwe EzLogger3000C handleiding

135 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 80 van 135
08 System Commissioning
75
User Manual V1.2-2025-04-15
RCR
The standards of German and other regions require that the inverter must provide signal
controlling port for RCR (Ripple Control Receiver), which can be used for grid scheduling.
To realize RCR, connect RCR to DI1/DI2/DI3/DI4/REF1 port of the EzLogger for active power
derating, or connect RCR to DI1/DI2/DI3/DI4/REF2 port of the EzLogger for reactive power
scheduling.
Parameter Description
Start Control Enable or disable RCR.
Operation Status
The operation status of the device. For instance, RCR1(100) means the
current operation state is RCR1, and feed in power accounts for 100% of
the rated power.
nRCR: operation status does not take eect.
Active Power
Scheduling
Select one or more DI ports according to the grid company’s require-
ments and RCR xture type, and congure the corresponding percent-
age. Percentage refers to the ratio of the system’s output power to its
rated power.
Support conguration of 16 percentage levels. Congure based on the
actual requirements of the grid company.
Do not repeat setting of state combinations of DI1–DI4. Otherwise, the
function will not operate properly.
If the actual DI port wiring connection does not match the web congu-
ration, the operation state will not take eect.
1
2
3
4
5
6

Bekijk gratis de handleiding van Goodwe EzLogger3000C, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkGoodwe
ModelEzLogger3000C
CategorieNiet gecategoriseerd
TaalNederlands
Grootte18464 MB