Giles GGF-400 handleiding

99 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 27 van 99
18
Installation
GGF Series Gas Fryer
4. After ignition, the surface of the heat exchanger should become hot & dry quickly (within approximately 15
seconds). Noticeable heat should be felt rising from the pot, indicating acceptable operation.
5. If burners do not light after two (2) attempts, or appear not to be heating properly, refer to Section 7,
Troubleshooting.
6. If the burner system appears to be operational, return SELECTOR switch to [OFF] & proceed with the next test in
Section 2.12.3
.
2.12.2 Burner Test continued
2.12.3 Filter Pump Test
1. Place the POWER switch in the [ON] position.
2. Open cabinet door.
3. With the filter pan disconnected, place the palm
of the hand tightly over the filter pan hose quick
coupling opening.
4. Briefly place the SELECTOR switch in the
[FILTERPUMP] position, then return to the
centered [OFF] position. If suction is felt, when
the pump ran, it is operating correctly; continue
to Section 2.12.4.
If the pump does not run, no suction is felt, or air
is blowing outward, refer to the Section 7,
Troubleshooting.
The following test will verify that the Filter Pump is operating correctly.
3
1
2

Bekijk gratis de handleiding van Giles GGF-400, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkGiles
ModelGGF-400
CategorieNiet gecategoriseerd
TaalNederlands
Grootte31766 MB