Festo PDAD-73-G1/2 handleiding
Handleiding
Je bekijkt pagina 16 van 42

16
Festo — PDAD — 2022-02i
Assembly
Rotating multi-way distributor
1. Unscrew the cover retaining screws and remove the cover.
2.
Unscrew the 4 retaining screws (A/F 5) of the multi-way distributor and remove it.
3.
Rotate the multi-way distributor 180°. Check that the two O-rings in the valve block are correctly
seated and position the multi-way distributor. Fasten the multi-way distributor with 4 retaining
screws (A/F 5).
– Maximum tightening torque 20 Nm.
4. Position the cover and fasten with the 2 retaining screws.
– Maximum tightening torque 1 Nm.
Bekijk gratis de handleiding van Festo PDAD-73-G1/2, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Festo |
Model | PDAD-73-G1/2 |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 4080 MB |