Elco VARION C-POWER handleiding

44 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 16 van 44
16 | ELCO GmbH
Assembly
Operation manual 50.0 | Status 10.2021
5.2.4 Flue gas routing
For the system to operate, the building must
have a flue, which must comply with the following
requirements:
B The local laws and regulations must be complied
with (e.g. in Germany, the building regulations).
B The flue gas routing must comply with the local
regulations (e.g. in Germany, DIN 18160).
B The flue gases must be removed via a flue.
B As a fundamental rule, the flue must extract the flue
gases via the roof.
B The dimensions for the flue gas ducting and flue
must be calculated on an individual basis.
B The gradient of the horizontal section must be min.
5 cm per metre.
B The flue must be inspected and approved for
operation (e.g. by a master chimney sweep).
B A flue gas silencer must be fitted in the flue gas
routing. The flue gas silencer (optionally available)
must be installed near the generation unit.
B The flue gas routing must have a water-filled siphon
at its lowest point.
B A carbon monoxide sensor can be additionally used
on site.
5.2.5 Exhaust air duct
D WARNING!
Risk of suffocation due to improper use of exhaust
air!
The exhaust air must not be used for heating purposes.
Poisonous gases may be produced inside the
generation unit that can lead to death by suffocation.
A Ensure that the exhaust air from the generation unit
is guided outside.
A Make sure that the exhaust air and flue gas are
always extracted separately to each other.
A Ensure that the supply air is not contaminated by
the exhaust air.
Additional devices with exhaust air (e.g. washer-dryers)
may only be installed subject to consultation with a
suitable specialist or chimney sweep.
5.2.6 Supply air supply
Sufficient supply air must be supplied for the
combustion process and the ambient temperature:
B The total requirement of the heating system (e.g. for
the peak load boiler) must be born in mind.
B The supply air supply must meet the system
specification.
Technical data.
B The supply air must not be supplied via a concentric
pipe if the inner pipe is used for flue gas routing.
B If the ambient temperature in the installation room is
permanently above 30 °C, additional air exchange is
required.
5.2.7 Gas supply
For the system to operate, a gas supply is required that
must comply with the following requirements:
B The gas supply must comply with the established
regulations (e.g. in Germany, TRGI).
B The system specifications (e.g. type and
composition of the gas) must be complied with.
Technical data.
B The building’s system must be fitted with a gas flow
monitor, gas meter and a gas filter.
B The gas flow monitor must meet the system
specifications.
Technical data.
B Connection via a gas appliance outlet is never
permitted.

Bekijk gratis de handleiding van Elco VARION C-POWER, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkElco
ModelVARION C-POWER
CategorieNiet gecategoriseerd
TaalNederlands
Grootte5865 MB