Ekko EP20E handleiding
Handleiding
Je bekijkt pagina 16 van 23

- 16 -
- 16 -
B= Every 1000 work hours, but at least once every six months
C= Every 2000 work hours, but at least once every 12 months
Additional operations should be performed in trial run period:
(In initial 50 – 100 working hours or after two months)
— Check the nuts on the wheels, and tighten them if necessary.
— Check the hydraulic components for leakage, and tighten them if necessary.
—Replace the hydraulic filter.
Bekijk gratis de handleiding van Ekko EP20E, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Ekko |
| Model | EP20E |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 2994 MB |







