EK Water Blocks EK-Quantum Velocity³ 1700/1851/AM5 handleiding

21 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 18 van 21
- 18 -
STEP 3
STEP 3
Position the CPU Water Block onto the Motherboard. Make sure to
align the holes (as shown in the picture).
Thumb Nut (4 pc) Spring (4 pc) Allen Key 2.5
STEP 4
Make sure to double check the layer of the Thermal Grease
before placing the water block onto the motherboard.
Before placing the water block, it is mandatory to
remove the protective foil from the cold plate.
STEP 4
Place the enclosed compression springs and thumb nuts over the
mounting screws (4x). Start fastening thumb nuts by hand and then
procede to tighten them, in a cross pattern, using allen key 2.5.
For this step, you will need:

Bekijk gratis de handleiding van EK Water Blocks EK-Quantum Velocity³ 1700/1851/AM5, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkEK Water Blocks
ModelEK-Quantum Velocity³ 1700/1851/AM5
CategorieNiet gecategoriseerd
TaalNederlands
Grootte2061 MB