EK Water Blocks EK-Quantum Reflection² 7000D D5 PWM D-RGB handleiding
Handleiding
Je bekijkt pagina 13 van 14

- 13 -
To make sure the installation of EK components was successful, we
recommend you perform a leak test for 24 hours.
When your loop is complete and filled with coolant, connect the
pump to a PSU outside of your system. Do not connect power to
any of the other components. Turn on the PSU and let the pump
run continuously. It is normal for the coolant level to drop during this
process as air collects in the distribution plate.
Inspect all parts of the loop, and in the eventuality that coolant leaks,
fix the issue and repeat the testing process. Ensure that all hardware is
dry before the system is powered on in order to prevent any damage.
TESTING THE LOOP
Bekijk gratis de handleiding van EK Water Blocks EK-Quantum Reflection² 7000D D5 PWM D-RGB, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | EK Water Blocks |
Model | EK-Quantum Reflection² 7000D D5 PWM D-RGB |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 943 MB |