Eaton Green Motion XCI000411 handleiding
Handleiding
Je bekijkt pagina 69 van 107

Figure 46. EV charger configured as Node with load balancing
8.3.5.2 Node conguration
To set the EV charger as the Node with static load balancing, set the parameters as per the following steps:
Step 1. Go to the “Load balancing” section (Figure 53).
Step 2. Check the “Enabled” checkbox. A set of new configuration options will appear.
Step 3. Set “Mode” to “Node”
Step 4. Make sure the name of the EV charger configured as Master is visible in the Master hostname/IP text box. In case the
name is not detected, enter the link parameters manually
Step 5. Check the “Prioritize this charger” checkbox in case the EV charger needs to be prioritized over the other EV chargers.
It will enable maximum charging current for the prioritized EV charger during current limiting events.
Step 6. The “Fallback current for the charger [A]” is set by default with a value of 0 Amps, but this value can be set up to a
higher value to allow the Node to apply that max. current in case of temporary disconnection from the Master. This parameter
could be modified by advanced user in “Advanced mode”.
Node configuration is similar in Online or Offline Load Balancing.
69GREEN MOTION BUILDING INSTALLATION MANUAL MN191028EN April 2024 www.eaton.com
Bekijk gratis de handleiding van Eaton Green Motion XCI000411, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Eaton |
| Model | Green Motion XCI000411 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 16416 MB |
