10. Maintenance
Installation, commissioning, maintenance or retrofitting of the EV charger must be performed by professional and
qualified personnel, who are responsible for complying with existing standards and local installation regulations.
Before starting connection operations, ensure that the external AC-line main switch is disconnected, and circuit
breakers are open.
Any operation requiring the main converter box to be opened can lead to electric shock hazards.
The opening of the EV charger as well as any configuration changes must be carried out by professional
and qualified personnel in accordance with the local safety and electrical regulations and laws.
Wait at least 10 minutes before removing the Green Motion Building EV charger. The enclosure could overheat
during its operation or be heated by direct sunlight. To avoid burns from an overheated surface caused by sunlight,
please use suitable PPE or wait for the equipment to cool down before accessing it.
Green Motion Building EV chargers are equipped with tamper detection functionality. In case the EV charger is
opened while powered on, a notification will be sent to the backend server. The EV charger will also prevent the
connected EV from charging.
10.1 Uninstall
Before starting any maintenance operations, make sure that the charging cable is not connected to the vehicle, that
the external AC-line main switch is turned off, and that the circuit breakers are open.
Wait at least 10 minutes before removing the Green Motion Building EV charger.
The enclosure could overheat during its operation, or be heated by direct sunlight, and it can cause burns on
contact. To avoid burns from an overheated surface caused by sunlight, please use suitable PPE or wait for the
equipment to cool down before accessing it.
To uninstall the unit:
Step 1. Disconnect any load.
Step 2. Open the housing by removing the fixing screws.
Step 3. Perform a factory reset on the charger.
Step 4. Disconnect the AC grid connectors.
Step 5. Unscrew the mounting screws.
Step 6. Close the front cover to avoid any injuries from sharp edges.
10.2 Firmware updates
It is mandatory to install and maintain the unit with the latest system update to enable new features and bug fixes.
After discussion with legal, please remove this sentence. For information related to available system updates refer to
the product website or contact Eaton technical support representative by email: BGTechSupport@eaton.com
•
In scenarios where Green Motion Building EV chargers are connected in a master-node network, it is
strongly recommended to upgrade the firmware of the EV charger configured as the Master first, followed
by upgrading the firmware of the EV chargers configured as Nodes.
•
EV charger will not perform an upgrade while an active charging session is in progress.
•
EV charger will not be available for charging when an upgrade is in progress.
The “Firmware Update” section allows to upload a firmware package to update the EV charger from the Configuration page.
101GREEN MOTION BUILDING INSTALLATION MANUAL MN191028EN April 2024 www.eaton.com
Bekijk gratis de handleiding van Eaton Green Motion XCI000411, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Eaton |
| Model | Green Motion XCI000411 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 16416 MB |