DreamLine Unidoor-X E12730-04 handleiding

61 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 29 van 61
© DreamLine
All Rights Reserved
© DreamLine
All Rights Reserved
26UNIDOOR-X (STYLE M) manual Ver 2 Rev 1 02/2019
©2019 DreamLine. All Rights Reserved
NOTE: If your model includes additional panel glass, locate the
manual for the panel glass installation in the panel glass
packaging. (See page 4 for details)
Fig 25
24
Hours
!
25. Apply a good quality mildew-resistant/waterproof silicone along the connection of both
U-Channels to the wall and threshold on the inside of the shower.
Remove the bottom section of the Hinge-Side Vinyl Seal (#33) and let the silicone cure before closing
the door to avoid contact with the Hinge-Side Vinyl Seal (#33). (Fig 25)
26. Allow 24 hours for the silicone to fully cure before using the shower.
NOTE: The surfaces need to be clean and free of debris before applying silicone.
!

Bekijk gratis de handleiding van DreamLine Unidoor-X E12730-04, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkDreamLine
ModelUnidoor-X E12730-04
CategorieNiet gecategoriseerd
TaalNederlands
Grootte9933 MB