Doyon KDPR11 handleiding
Handleiding
Je bekijkt pagina 17 van 32

• NOTE: ALL HEATERS ARE INSTALLED UNDER A ELECTRICAL BOX
• INSTALL DUCT SUPPORTS(50039149+50039150) USING (2) 1/4-20 SS PHILIP PAN
HEAD SCREWS (53-0037) EACH
• FINISH INSTALLING DUCT SUPPORTS(50039149+50039150) USING (4) 1/4-20 SS
PHILIP PAN HEAD SCREWS (53-0037) EACH
• MOUNT BOTH ELEMENT MOUNT ASSEMBLIES (50039146), USING (4) 10-32 SS
PHILIP PAN HEAD SCREWS (53-0110) EACH.
• FEED ELEMENT AND PROBE LEADS THROUGH GROMMETS ON CEILING ABOVE
ELEMENTS.
o WE RECOMMEND USING A FISH TAPE TO PULL THE ELEMENT WIRES INTO
THE ELECTRICAL BOXES
o MAKE SURE SHEATH ON PROBE LEAD IS POSITIONED IN THE BOX AND NOT
GOING THROUGH THE GROMET OPENING
o CONNECT ELEMENT AND PROBE LEADS (REFER TO SUPPLIED ELECTRICAL
DIAGRAM IN CONTROL BOX)
• INSERT HIGH LIMIT PROBE INTO BRACKET
o BEND CORNERS ON BRACKET TO SECURE PROBE
FEED ELEMENT WIRE
THOUGH THE
GROMMETS ABOVE.
UNITS THAT HAVE
WAGOS ATTACH TO THE
ELEMENT LEAD, MUST
RUN THE WAGO
CONNECTION
THROUGHT THE
GROMMET INTO THE
ELECTRICAL BOX. IN
ORDER TO RUN THE
WAGO CONNECTION
THROUGH THE
GROMMETS THE WAGO
HAS TO BE TEMPORARLY
REMOVED
Bekijk gratis de handleiding van Doyon KDPR11, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Doyon |
Model | KDPR11 |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 11166 MB |