Deye SUN-70K-SG02HP3-EU-EM6 handleiding

63 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 44 van 63
- 42 -
5.8 Grid Setting Menu
Reconnection Time PF
60s
1.000
Grid Setting/Connect
Low frequency
Normal connect
48.00Hz
Low voltage
185.0V
High frequency 51.50Hz
Normal Ramp rate 10s
Reconnect Ramp rate 36s
High voltage
265.0V
Low frequency
Reconnect after trip
Low voltage
High frequency
51.30Hz
High voltage
263.0V
48.20Hz
187.0V
Grid
Set2
Over voltage U>(10 min. running mean)
Grid Setting/IP Protection
260.0V
Set3
Grid
--
HV1
265.0V
0.10s
--
HV2
265.0V
0.10s
HV3
--
LV1
185.0V
0.10s
--
LV2
185.0V
0.10s
185.0V
LV3
--
HF1
51.50Hz
0.10s
--
HF2
0.10s
HF3
--
LF1
48.00Hz
0.10s
--
LF2
0.10s
LF3
0.10s—Trip time.
LV1: Level 1 undervoltage protection point;
LV2: Level 2 undervoltage protection point;
LV3: Level 3 undervoltage protection point.
HV1: Level 1 overvoltage protection point;
HV2: Level 2 overvoltage protection point;
HV3: Level 3 overvoltage protection point.
HF1: Level 1 over frequency protection point;
HF2: Level 2 over frequency protection point;
HF3: Level 3 over frequency protection point.
LF1: Level 1 under frequency protection point;
LF2: Level 2 under frequency protection point;
LF3: Level 3 under frequency protection point.
265.0V
51.50Hz
51.50Hz
48.00Hz
48.00Hz
U
V
W
400VAC
Rz
Rz: Large resistance ground resistor. Or the system
doesn’t have Neutral line
400VAC 400VAC
N
0/23
Grid Setting/Grid code selection
Grid Mode
Grid Level
0/120/240
0/240/120
Grid
Set1
Grid Frequency
50HZ
60HZ
General Standard
Phase Type
IT system-neutral is not grounded
LN:230V/LL:400V(AC)
Grid Mode:
General Standard、UL1741 & IEEE1547、CPUC RULE21、
SRD-UL-1741、CEI_0_21_Internal、EN50549_CZ-PPDS(>16A)、
Australia_A、Australia_B、Australia_C、AS4777_NewZealand、
VDE4105、OVE-Directive R25、EN50549_CZ_PPDS_L16A、
NRS097、G98、G99、EN50549_1_Norway_133V、
EN50549_1_Norway_230V、Japan_200VAC_3P3W、
CEI_0_21_External、CEI_0_21_Areti、Japan_400VAC_3P3W、
Japan_415VAC_3P4W、EN50549_1_Switzerland.
Please follow the local grid code and then choose the
corresponding grid standard.
Grid level: there’re several voltage levels for the inverter
output voltage when it is in off-grid mode.
LN:220V/LL:380V(AC), LN:230V/LL:400V(AC).
0/23
Grid Setting/Grid code selection
Grid Mode
Grid Level
0/120/240
0/240/120
Grid
Set1
Grid Frequency
50HZ
60HZ
General Standard
Phase Type
IT system-neutral is not grounded
LN:220V/LL:380V(AC)
IT system: If the grid system is IT system, then please enable this option. All the live lines of IT system are insulated
from ground, and the neutral point of the IT system is grounded through high impedance or not grounded (as shown
in the following figure).
Normal connect: The allowed grid voltage/frequency
range when the inverter operates normally.
Normal Ramp rate: It is the startup power ramp.
Reconnect after trip: The allowed grid voltage
/frequency range for the inverter connects the grid
after the inverter trip from the grid.
Reconnect Ramp rate:It is the reconnection power ramp.
Reconnection time: The waiting time for the inverter
connects the grid again after tripping.
PF: Power factor, which is the ratio of active power to
apparent power in AC circuits and can be used to adjust
the output active power and reactive power of inverter.

Bekijk gratis de handleiding van Deye SUN-70K-SG02HP3-EU-EM6, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkDeye
ModelSUN-70K-SG02HP3-EU-EM6
CategorieNiet gecategoriseerd
TaalNederlands
Grootte8311 MB