D-Link DPS-PWR1200AC handleiding

46 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 23 van 46
DXS-3130-28-P Layer 3 Stackable Managed Switch Hardware Installation Guide
23
Power On (AC Power)
Plug one end of the AC power cord into the power socket of the Switch and the other end into the local power source
outlet. After the system is powered on, the power LED will light up green to indicate that the system has been powered
up.
Power Failure (AC Power)
In the event of a power failure, just as a precaution, unplug the power cord from the Switch. After the power returns,
plug the power cord back into the power socket of the Switch.
Connecting PoE BT to the Switch
When AC power is not available, you can power on the Switch using PoE BT through the MGMT port. The Switch
receives to 90 Watts of DC power from Power Sourcing Equipment (PSE) over a Category 5e/6a LAN cable.
When AC power is on, you can use the PoE BT connection through the MGMT port as a backup power supply for the
Switch. When AC power fails, the PoE BT power through the MGMT port will keep the Switch powered on till your AC
power returns.
NOTE: Only the DXS-3130-28P features a MGMT PSE-capable port.
NOTE: The PSE cable for DXS-3130-28P’s MGMT port cannot exceed 3 meters length.

Bekijk gratis de handleiding van D-Link DPS-PWR1200AC, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkD-Link
ModelDPS-PWR1200AC
CategorieNiet gecategoriseerd
TaalNederlands
Grootte7634 MB