Crestron CLTI-1MC4 handleiding

6 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 2 van 6
Terminal Block & Module Crestron CLTI- & CLXI-1MC4
Terminal Block Installation and Field
Wiring
NOTE: To install a CLTIBN Circuit Breaker Terminal
Block, refer to the latest version of the CLTIBN
Installation Guide (Doc. 6561) which can be downloaded
from the Crestron website (www.crestron.com/manuals).
NOTE: Both left-side and right-side adhesive wiring
labels are provided. The left-side labels are used in both
single and double-wide enclosures. The right-side labels
are only used in double-wide enclosures.
1. Remove the backing from the left or right
adhesive wiring label.
2. Apply the adhesive label by aligning the holes in
the label with the appropriate holes on the
Crestron Automation Enclosure where the
terminal block is to be mounted. For information
on mounting locations, refer to the latest version
of the CAEN Installation Guide (Doc. 5940) or
the CAENIB Installation Guide (Doc. 6562). The
wiring label lies beneath the terminal block as
shown in the two wiring diagrams on this page.
3. Use the two supplied self-tapping pan Phillips
screws (8B x ¼-inch (6 mm) length) to secure
the terminal block to the Crestron Automation
Enclosure.
CAUTION: The jumper on the blue section of the
terminal block ties the neutral in to the neutral outs.
This jumper should never be removed.
NOTE: Use copper conductors only – rated 75°C.
4. With the circuit breaker turned off, connect the
circuit feed (LINE and NEUTRAL) and
controlled circuit (LOAD) wires to the terminal
block per the markings provided on the wiring
label (as shown in the diagrams on this page).
Terminal blocks accept one 2.5 - 6.0 mm
2
wire.
Wires should be stripped to 12 mm. Tighten
terminal blocks to 1 Nm.
NOTE: Only one motor may be wired per circuit.
5. Grounding terminal blocks are available in the
cabinet for termination of ground wires. Tighten
to 4 Nm (2.5 - 6.0 mm
2
), 4.5 Nm (10.0 mm
2
), or
5.1 Nm (16 – 25 mm
2
).
6. Test the circuit for electrical faults by connecting
LINE to OPEN 1. Switch on the circuit breaker
and check that it does not trip and that the load
connected to OPEN 1 is receiving power. Switch
off the circuit breaker, remove the connection
between LINE and OPEN 1, and repeat this step
for CLOSE 1 and then sequentially for each
OPEN and CLOSE motor connection.
NOTE: If installing in a CAENIB, complete the
installation with a CAENIB-BP Blank Plate. Refer to the
latest version of the CAENIB-BP Installation Guide (Doc.
6563) for details.
Wiring Diagram of the Terminal Block to the Feed and
Load(s) (Single-wide and Left Side Double-wide Enclosures)
GROUNDING
TERMINAL
BLOCK
GND
NEUTRAL
AREA FOR
MODULE
LOCATION
LABEL
JUMPER
TERMINAL
BLOCK
LEFT SIDE
WIRING LABEL
TO
MOTOR 1
TO
MOTOR 2
TO
MOTOR 3
TO
MOTOR 4
LINE
(FROM 10
OR 16 AMP
CIRCUIT
BREAKER)
Wiring Diagram of the Terminal Block to the Feed and
Load(s) (Right Side Double-wide Enclosures)
NEUTRAL
AREA FOR
MODULE
LOCATION
LABEL
JUMPER
TERMINAL
BLOCK
RIGHT SIDE
WIRING LABEL
TO
MOTOR 4
TO
MOTOR 3
TO
MOTOR 2
TO
MOTOR 1
LINE
(FROM 10
OR 16 AMP
CIRCUIT
BREAKER)
GROUNDING
TERMINAL
BLOCK
GND
2 Terminal Block & Module: CLTI- & CLXI-1MC4 Installation Guide – DOC. 6409A

Bekijk gratis de handleiding van Crestron CLTI-1MC4, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkCrestron
ModelCLTI-1MC4
CategorieNiet gecategoriseerd
TaalNederlands
Grootte969 MB