Chief DVM27U2E handleiding

24 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 14 van 24
DVM27U Series Installation Instructions
14
15. Slide the H-blocks together within the extrusion and attach
a magnetic 2-foot level to side of upright. (See Figure 7)
Figure 7
16. Mark mounting hole location along lower line based on
horizontal locations determined in Step 2a. (See Figure 7)
17. Drill a 7/32" hole at the location of the first lower mounting
hole. (See Figure 7)
18. Use 5/16 x 2 1/2" hex head lag screw (CA) and 5/16"
washer (CE) to install right upright (B) to wall at lower
mounting hole. Center the lag bolt horizontally along
mounting slot. (See Figure 7)
19. Hold mount upright and tighten upper lag bolt (CA) that was
partially installed in Step 14. (See Figure 7)
20. Use a tape measure to ensure the uprights (A and B) are
mounted the proper distance apart from each other based
on mounting pattern width (MPW). (See Figure 8)
Figure 8
21. (Optional) Install four mounting buttons (D or E) onto back
of a display (if available) and install onto H-blocks to ensure
the uprights are properly distanced. (See Figure 9) and
(See Figure 11)
Figure 9
15
7/32"
16 17
(CA)
18
(CA)
19
(CE)
Just a tip - Install a drywall screw (CC) through
adjacent hole in foot to prevent the upright from
"walking" in slot when tightening lag.
MOUNTING PATTERN WIDTH
DISPLAY WIDTH
MOUNTING PATTERN WIDTH
MOUNTING PATTERN WIDTH
DISPLAY
WIDTH
DISPLAY WIDTH
MOUNTING PATTERN WIDTH
(D or E) x 4
21
21

Bekijk gratis de handleiding van Chief DVM27U2E, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkChief
ModelDVM27U2E
CategorieNiet gecategoriseerd
TaalNederlands
Grootte3836 MB