SD675650 ISSUE 6 M172 DELTA
When e Delta leaves e Danerm Ltd. factory it is fully tested and is
ready to operate when connected to e correct power supply, services and
ductwork. The default settings allow e Delta to be powered and started
safely, provided e pre-commissioning checklist has been actioned.
Pre-commissioning checklist
In order for e Delta to be properly commissioned aer installation, e
following actions are essential:
y The pool hall structure is complete and sealed according to e design
specification.
y All ductwork is fully installed and finished, including all inlet and outlet
grilles.
y The pool water filtration system is connected, complete, fully
commissioned and operational.
y LPHW connections are complete and e heat source is installed, fully
commissioned and operational.
y All electrical connections are complete and all power and control systems
are wired and fully commissioned.
Initial start-up
Aer installation and completion of e services on e pre-commissioning
checklist, e Delta can be started:
y Connect power by turning on e local isolator.
y Confirm e red power light illuminates.
y The touchscreen should turn on and go rough a start-up sequence aer
a short delay. If e touchscreen does not start, check:
– Correct phase rotation
– Control MCB inside e electric box is turned on
– Touchscreen cable connections
y When e touchscreen displays e first home screen, e Delta can be
turned on via e touchscreen (see User Settings).
The Delta should be started well before commissioning to ensure e pool
water and air have reached design temperatures prior to commissioning. The
default settings will normally allow e Delta to stabilise e conditions ready for
commissioning.
Several days may be required to heat up e pool water. If e pool is covered,
e Delta may be put into 'water heating only' mode (see User Settings)
to save energy on air heating while e pool heats up. If high humidity or
condensation occurs, e Delta should be returned to full-function operation.
When connected to an air-source heat pump as e LPHW source, it may be
necessary to swap e Delta over to 'heat recovery to air priority' to help heat
e pool hall (see User Settings).
Commissioning
For full commissioning procedure, please refer to separate commissioning
document and report, which should be completed fully. Summary of
commissioning procedure:
Pool hall and plant room
3 Check – is e building finished in accordance wi e original plans and
specification, ready for commissioning? Check current temperatures and
humidity, calibrate air/water temperature and humidity sensors.
3 Check – is Delta service and maintenance access adequate?
Ductwork and air flow
3 Check – is all ductwork and any plenum chamber insulated? Special
attention should be made to e insulation of e Exhaust Air and Fresh Air
inlet ducting to prevent condensation problems.
3 Check – are ere any significant draughts in e pool hall (or plant room
if used as a plenum) rough poorly fitting doors, windows, pipe ducts,
etc? This will let in unwanted ambient air, affecting control, eciency and
energy usage.
3 Check – are exhaust air and fresh air ductwork properly sealed from plant
room and oer parts of e building?
3 Check – e above should be checked by measuring plant room and pool
hall air temperatures. If e plant room is acting as a plenum chamber bo
temperatures should correspond. If e plant room air temperature is lower,
en ambient air is leaking in. This leak should be located and rectified.
3 Check – are all air inlets and outlets free from obstructions? Are exhaust
air and fresh air grilles adequately separated and not allowing recirculation
from exhaust to inlet?
3 Check – are air filters clean?
3 Action – measure air volumes and commission fan speeds.
Pool water
3 Check – is pool water connected correctly?
3 Check – is pool water flow rate correct?
3 Check – is pool cover installed and used?
LPHW
3 Check – is LPHW connected correctly and insulated?
3 Check – is LPHW flow rate correct?
3 Check – size and type of LPHW heat source?
3 Record – LPHW flow and return temperatures wi air and water heat
exchangers in operation.
Electrical
3 Check – is electric installation complete?
3 Check – is local isolator present?
3 Check – is MCB suitable for e Delta model installed?
3 Record – MCB details
3 Check – is fan rotation direction correct?
3 Record – which customer terminals are in use.
3 Record – compressor and fan running amps.
4.0 AFTER INSTALLATION
Bekijk gratis de handleiding van Calorex Delta DT 8, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Calorex |
| Model | Delta DT 8 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 13120 MB |