Bunn WEQ-10 System handleiding
Handleiding
Je bekijkt pagina 12 van 20

SYSTEM STARTUP
1. Check all connections to make sure they
are secure, including all U Clips at each
tting on the manifold assembly.
2. Open the ush ball-valve on the ltration
system ensuring the drain tubing is direct-
ed to a drain or a container.
3. Turn on the water supply to the system.
4. Flush the cartridge(s) by running water for
ve minutes through the system. This will
purge any trapped air and nes.
NOTE: The WQ model is equipped with
unique patented Filter Integrity Ports, which
can indicate if there is an issue with the car-
tridge. For more information about the Filter
Integrity Ports, refer to the Maintenance sec-
tion of this manual. During the initial startup
of the system, a slight amount of water may
weep out of the ports (Figure 4). This is typical
during system pressurization phase.
5. Close the flush ball-valve and turn on power
to equipment.
6. Check for leaks.
FIGURE 4. FILTER INTEGRITY PORTS
INSTALLATION (CONTINUED)
56000.0500 B
7/21 © 2021 Bunn-O-Matic Corporation
Page 12
www.bunn.com
803426
Bekijk gratis de handleiding van Bunn WEQ-10 System, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Bunn |
Model | WEQ-10 System |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 5997 MB |