Bunn WEQ-10 System handleiding
Handleiding
Je bekijkt pagina 10 van 20

INSTALLATION
The cutting edge modular technology of this
water ltration system allows for full system
customization at the installation site. Using the
wide range of available ttings and adapters,
the system is adaptable to any food-service
water ltration application.
To aid with installation, each manifold includes
a built-in level indicator to ensure proper instal-
lation.
• Read instructions completely before pro-
ceeding with the installation.
• Allow a minimum of 6" clearance from base
system to allow for cartridge change outs.
• The system may be installed using metal or
non-metallic piping systems.
• The mounting hardware used must be se-
lected and installed so that the system is
rmly attached to the mounting surface.
The system mounting hardware must keep
the system from moving during routine ser-
vice and operation.
• System and installation must comply with
applicable state and local regulations.
• Use system on cold water source only.
• System conforms to NSF/ANSI Standard
42 for claims specied on the performance
data sheet.
• Do not use with water that is microbio-
logically unsafe or of unknown quality
without adequate disinfection before or
after the system.
• System must be installed in a vertical, up-
right and level position.
• Systems certied for cyst reduction may be
used on disinfected water that may contain
lterable cysts.
1. Shut down all equipment downstream of
the system installation site and turn off the
water supply.
2. Using the mounting holes in the manifold
as a guide, mark and drill pilot holes for
the mounting bolts.
NOTE: System must be installed in vertical,
upright, and level position.
3. Connect incoming cold water line to lower
inlet port of the manifold connection.
NOTE: Use Teon™ tape only. Do not use
paste type thread sealant.
4. Connect the upper outlet port to the
equipment system line.
NOTE: Remove all plastic wrapping and dust
caps prior to lter installation.
5. Write the date the lter was installed in
the designated box on the lter canister.
6. Install the lters into the manifold by
inserting them into the manifold head and
swiftly turning a quarter turn to the right
(clockwise) until they are fully seated.
7. For systems equipped with a ush valve,
connect the ¼" black tubing into the ball
valve on the manifold by pushing the tub-
ing rmly into the quick connect tting
until seated. This valve is used to ush and
de-pressurize the system; so proximity to a
drain or a bench to hold a bucket is rec-
ommended.
NOTE: The ush line should NOT be hard
plumbed into the drain.
56000.0500 B
7/21 © 2021 Bunn-O-Matic Corporation
Page 10
www.bunn.com
803426
Bekijk gratis de handleiding van Bunn WEQ-10 System, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Bunn |
Model | WEQ-10 System |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 5997 MB |