Berbel Ergoline 2 BKH 110 EG-2 handleiding

132 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 116 van 132
116
Installation
6006910_0 – 18.11.2023
a
a
b
b
a = 7
b = 3-6
The top fastening screws should only be tightened once the
device has been aligned.
The lower fastening screws prevent the device pulling away
from the wall and are no longer accessible after the device is
hung in place.
1 Tighten the mounting screws appropriately.
. WARNING!
Danger of injuries through improper handling!
Hanging the device requires a great deal of physical exertion
due to its size and weight. If the device falls down, serious
injuries are possible.
1 Two persons are required to hang the device.
1 Ensure stable footing when hanging the device.
1 Ensure that no other people are in the working area.
. ATTENTION!
Danger of property damage through improper handling!
Hanging the device requires a great deal of physical exertion
due to its size and weight. If the device falls, the device,
kitchen furnishings and other objects could be damaged.
1 Cover the cooled hob.
1 Keep the installation area clear.
1 Hang the device on the mounting points.
1.
1.
2.
3.
1.
2.
3.
1 Check the horizontal alignment of the device.
1 Align the device with the adjusting screws.
1 Tighten the mounting screws.

Bekijk gratis de handleiding van Berbel Ergoline 2 BKH 110 EG-2, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkBerbel
ModelErgoline 2 BKH 110 EG-2
CategorieAfzuigkap
TaalNederlands
Grootte16641 MB