ACR ELT 1000 handleiding
Handleiding
Je bekijkt pagina 24 van 65

ARTEX PRODUCTS / ACR ELECTRONICS, INC.
DESCRIPTION, OPERATION, INSTALLATION AND MAINTENANCE MANUAL
ELT 1000 (P/N: A3-06-2749-1)
Y1-03-0259 Rev. AC Company Confidential 25-62-33 Page 24 of 65
TEST AND FAULT ISOLATION
1. Inspection and Test Regulatory Requirements
A. United States
1) In accordance with FAR Part 91, Subpart C, § 91.207 (d), the ELT must be inspected within 12 calendar
months after the last inspection for:
a) Proper installation
b) Battery corrosion
c) Operation of controls and crash sensor; and
d) The presence of a sufficient signal radiated from its antenna.
2) All maintenance shall be performed in accordance with FAR Part 43, Appendix D, which requires the
following inspections at each annual or 100-hour inspection:
a) ELT and mount for improper installation
b) Wiring and conduits for improper routing, insecure mounting, and obvious defects
c) Bonding and shielding for improper installation and poor condition
d) Antenna, including trailing antenna, for poor condition, insecure mounting, and improper operation
B. Canada
1) CAR Part VI, Standard 625, Appendix C, requires the ELT to be inspected at intervals not exceeding 12
months.
2) All maintenance and testing shall be performed in accordance with the requirements of CAR Part V,
Standard 571, Appendix G, which requires:
a) Corrosion inspection
b) Operational testing
c) Performance testing (not to be satellite receivable, i.e. in a Faraday cage), including:
1. Measured peak power after 3 minutes of operation
2. Measured frequency after 3 minutes of operation
3. Audio modulation, which shall be recognizable as a typical ELT signal
4. Measured current draw in the ‘ARM’ (OFF) and in the ‘ON’ position, as specified by the manufacturer
5. The automatic activation system
C. Other Countries
1) For all other countries, maintenance and testing shall be conducted in accordance with the requirements of
applicable national regulatory authorities and the requirements herein, as applicable. Local regulations and
requirements shall take precedence.
2) In the absence of any inspection requirements from national regulatory authorities, operators should follow
the annual inspection procedures outlined in Inspection and Test Regulatory Requirements, subsection
United States above.
Bekijk gratis de handleiding van ACR ELT 1000, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | ACR |
| Model | ELT 1000 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 9637 MB |

