Abus Smartvest Pro APP45000 handleiding
Handleiding
Je bekijkt pagina 28 van 116

| 28
5.3 Installation
Installation with screws
1. Open the vibration detector with a thin slotted
screwdriver.
2. Screw the vibration detector into the desired
position using 2 screws. You must rst break
through the intended holes carefully using a
screwdriver or drill.
3. Replace the housing cover.
Mounting with adhesive pads (alternative)
1. Please thoroughly clean the areas where
you would like to attach the adhesive pads
rst.
2. Ax the two adhesive pads to the
underside of the vibration detector.
3. Secure the vibration detector in the desired
position.
Bekijk gratis de handleiding van Abus Smartvest Pro APP45000, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Abus |
| Model | Smartvest Pro APP45000 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 12469 MB |







