Zodiac eXO iQ Dual Link handleiding
Handleiding
Je bekijkt pagina 10 van 60

8
❷ Installing the salt water chlorinator
2.1 I Installing the cell
• The cell must be installed on the piping a er the ltra on system, a er any measurement sensors, and
a er any hea ng system.
Installing the chlorinator only
(Example with eXO® (iQ))
Installing the chlorinator + op onal module
(Example with eXO® (iQ))
• The cell must always be the last element placed on the pool return pipe (see diagram).
• It is always recommended to install the cell on a by-pass. This assembly is MANDATORY if the
fl ow is in excess of 18 m³/hour to avoid head loss.
• If you installed the cell on a by-pass, it is recommended to t a check valve downstream from
the cell instead of a manual valve, to avoid any risk of incorrect con gura on which could
result in poor circula on inside the cell.
2.1.1 eXO® (iQ) cell
12.5 cm
21.5 cm
32 cm
11 cm
15.5
cm
21.5
cm
11 cm
21.5 cm
• Make sure that the cell is placed HORIZONTALLY. The water should ow from the electric connec ons
towards the opposite side.
• Use the screw-on ngs to x the cell to the pipes.
• For Ø63 mm pipes, glue them directly to the screw-on ngs. For Ø50 mm pipes, use glue-on PVC adapters
of the corresponding diameter (grey models; the white models are for 1 ½’’ UK pipes).
• Connect the cell power cord following the wire colour codes (red, black and blue connectors) and then re t
the protec ve cap. The two red wires can be connected to one or the other red terminals on the electrode.
Bekijk gratis de handleiding van Zodiac eXO iQ Dual Link, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Zodiac |
Model | eXO iQ Dual Link |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 20621 MB |