Warmup VLo Ultra-12 handleiding

32 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 7 van 32
7
Components available from Warmup
Important installation information
On delivery of the Ultra-12 panels ensure that they are stored in
a dry weather tight area, away from chemicals and that they are
stackedhorizontallyonaatandlevelsurface.
Performasiteinspection.Youwillneedtoconrmthatall
measurements and other requirements on site match your
working drawings. Ensure that all areas are correctly prepared, dry
and protected from weather.
EnsurethesuboorispreparedtoanSR1standard.Failuretodo
somayresultinanunstableandnoisynishedoor.
Inspect the site for possible hazards that could damage the
Warmup pipe, such as nails, staples, materials or tools.
Use a pipe cutter designed for plastic pipe ensuring that there are
no burrs on the pipe ends. It is important to achieve a clean cut.
Donotpullpipefromthecoilwhileitissittingat.Itmustbe
unwound from the coil, rotating the coil as the pipe is pulled from
the inside.
Do not force the pipe into bends. It is easier to lay the pipe with
a large radius and then gently pull the pipe to the required bend.
The minimum bending radius is 5 times the diameter of the pipe.
Do not kink the pipe. Excessive bending of the pipe can cause it to
kink,wherethisoccursowmaybeobstructedorreduced.Kinked
pipe must be repaired or replaced. To repair a kink, straighten
the pipe and simply heat the area with a hot air gun until the kink
disappears.
If installing levelling compound over Ultra-12, ensure it is suitable
forusewithcompressibleunderoorheatingpanelsandapplied
as a single layer.
Beforeinstallingtheoornish,itssuitabilityforusewith
underoorheatinganditsmaximumoperatingtemperature
should be checked against required operating conditions.
Underoorheatingperformsthemostecientlywithconductive,
lowresistanceoornishessuchasstoneandtiles.Consideration
should be given to the thermal resistance and temperature limits
ofthechosenoorcoveringanditsimpactonthesystemheat
output.
Additional components that may be required as part of your
Warmup heating installation:
Manifold, mixing unit, actuators, valves and euroconus connectors
Wiring centre
Warmup thermostats
HiDECKOverlay18
HiDeck PRO Adhesive
Warmup perimeter strip
Mapei Ultraplan Renovation Screed 3240
Adhesives

Bekijk gratis de handleiding van Warmup VLo Ultra-12, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkWarmup
ModelVLo Ultra-12
CategorieNiet gecategoriseerd
TaalNederlands
Grootte8703 MB