Warmup VLo Nexxa-12 handleiding
Handleiding
Je bekijkt pagina 4 van 24

4
Please also read the full instructions that follow this section.
Quick install guide
• The suboor must be smooth,
dry, frost-free, solid, suitably
weight-bearing and dimensionally
stable.
Referring to its instructions, prime
the suboor and the bottom
30 mm of adjacent walls using
Warmup Primer.
• Cut membrane to size as
required, peel back the release
lm and tack into place. Once
correctly positioned, press down
rmly.
Lay additional sheets
overlapping the outer row of
smaller castellations to create a
continuous layer.
• Use Warmup Pipe Bend Supports
where the pipe exits the oor at
the manifold location.
• The suboor must be
pre-insulated unless it is an
intermediate oor.
Ensure the suboor is prepared
to an SR2 Surface Regularity.
• Install Warmup perimeter strip
around the perimeter of the oor
and any penetrations to allow for
expansion and contraction of the
oor.
• Lay the pipe in a spiral
conguration, pressing it into the
castellations of the membrane.
1 2
3 4
5 6
SR2
2 m < 5 mm
Bekijk gratis de handleiding van Warmup VLo Nexxa-12, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Warmup |
| Model | VLo Nexxa-12 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 4711 MB |






