All oor nishes
Step 8 - Floor covering
Before installing any oor nish, adhesive or underlay over the
oor deck, the installation requirements of each must be checked
to ensure compatibility with underoor heating.
Underoor heating performs the most eciently with conductive,
low resistance oor nishes such as stone and tiles. The maximum
thermal resistance of the oor should not exceed 0.15 [m²K/W].
1
Floor nish
2
Floor deck
Floor deck to be tted in line with manufacturer instructions.
3
Warmup 16mm Pipe
4
Warmup Tectora diuser plates
Stapled to joists at 150mm spacings.
5
Warmup pipe clips
6
Flow and return pipes
Installed beneath the Tectora diuser plates, notched or through holes drilled
in the joists in line with building regulations.
7
Service pipe insulation
Service pipes must be insulated within the joist space
8
Joists at 400mm centres
9
Insulation
Installed with its top surface 19mm below the top of the joists, such that it
properly supports the Tectora diuser plate and the installed pipe
10
Battens / supports
To support the insulation layer
10
9
8
6
7
5
4
3
2
1

Bekijk gratis de handleiding van Warmup Tectora, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkWarmup
ModelTectora
CategorieNiet gecategoriseerd
TaalNederlands
Grootte8419 MB