Warmup Nexxa handleiding

36 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 12 van 36
12
Step 2 - Suboor preparation
Lay a damp proof membrane
over the suboor to prevent
water ingress.
Lay insulation board over
the membrane referring to
manufacturer instructions and in
line with building regulations
Ensure the insulation board is
pressed against the perimeter
strip.
Install perimeter strip around the
perimeter of the room to allow for
dierential movement between
nished oor level and walls.
Tape the perimeter strip to the
wall to hold in position.
The suboor must be clean,
solid, structurally sound and
dimensionally stable. Ensure the
suboor is prepared to an SR2
standard (SR2 - the maximum
permissible departure over a 2 m
straight edge is 5 mm).
If necessary a blinding layer
should be applied.
1 2
43
Ensure the perimeter strip is
installed with the integrated
polyethylene skirt facing out
from the wall.
If installing Nexxa
Insulating & Acoustic
panels this insulation layer
may not be required. Refer
to local building regulations.
The panels can be laid
directly on the damp proof
membrane

Bekijk gratis de handleiding van Warmup Nexxa, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkWarmup
ModelNexxa
CategorieNiet gecategoriseerd
TaalNederlands
Grootte8567 MB