Warmup Metro handleiding

28 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 21 van 28
21
Troubleshooting
ISSUE 1 - Staples coming out of the insulation layer
PROBLEM SOLUTION
Pipe turns are not being held at the
correct spacing or incorrect number of
staples used.
Pipe bends should have one
staple at the top of the turn
with two staples either side at
the beginning of the turn. The
distance between the three
staples should be 100mm.
Incorrect staple size used.
60mm staples should be
used on insulation boards of
minimum thickness 40mm.
For 20-40mm insulation 40mm
staples can be used.
Insulation boards are wet. Allow the boards to dry.
ISSUE 2 - Metro rail not sticking to the damp proof membrane
PROBLEM SOLUTION
Self-adhesive back of rail not adhering
correctly to damp proof membrane
due to site conditions
Staple the Metro rail to the
insulation layer using the
Warmup clips
ISSUE 2 - Running out of pipe/excess pipe leftover
PROBLEM SOLUTION
When laying the pipe, incorrect pipe
spacing has been used.
The pipe will have to be
installed again at the correct
spacing as per your design
layout�
ISSUE 3 - Floor overheating at ow and returns to manifold
PROBLEM SOLUTION
As the pipes reach the manifold they
are tightly packed together which will
give a higher heat output.
The pipes will need to be
insulated using 15mm conduit
or pipe lagging.
ISSUE 4 - Excessive/insucient heat output
PROBLEM SOLUTION
Incorrect water temperature
Refer to System Performance
chart to calculate the required
water temperature

Bekijk gratis de handleiding van Warmup Metro, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkWarmup
ModelMetro
CategorieNiet gecategoriseerd
TaalNederlands
Grootte7455 MB