Curing times for sand/cement screeds are typically 21 days. DO NOT
switch on the heater until the screed has fully cured.
The heating should not be turned on until the screed has fully
cured. Once cured the heater can be switched on and the oor
brought up to 20-25° C. This shall be maintained for at least 3 days
after which the maximum design temperature shall be set and
maintained for at least a further 4 days.
• Before the screed is laid the
pipe should be pressure tested
and then held at 3 bar whilst
screeding. This will enable any
leaks to be detected immediately.
Please refer to the manifold
manual for guidance.
• Apply the screed layer referring to the screed manufacturers instructions
for mixing, drying and curing information.
3
4
Step 5 - Lay the screed layer
• Any pipe crossing an expansion
joint should be protected with a
300mm conduit, 150mm either
side of the joint.
2
Bekijk gratis de handleiding van Warmup Metro, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Warmup |
| Model | Metro |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 7455 MB |