Perform a site inspection. You will need to conrm that all
measurements and other requirements on site match your
working drawings. Ensure that all areas are correctly prepared, dry
and protected from weather.
Inspect the site for possible hazards that could damage the
Warmup pipe, such as nails, staples, materials or tools.
Use a pipe cutter designed for plastic pipe ensuring that there are
no burrs on the pipe ends. It is important to achieve a clean cut.
The installation of the system must comply current edition of
building regulations.
Do not pull pipe from the coil while it is sitting at. It must be
unwound from the coil, rotating the coil as the pipe is pulled from
the inside.
Do not force the pipe into bends. It is easier to lay the pipe with a
large radius and then gently pull the pipe to the required bend. The
minimum bending radius is 5 times the diameter of the pipe.
Do not kink the pipe. Excessive bending of the pipe can cause it to
kink, where this occurs ow may be obstructed or reduced. Kinked
pipe must be repaired or replaced. To repair a kink, straighten
the pipe and simply heat the area with a hot air gun until the kink
disappears.
Ensure the suboor is prepared to an SR2 standard. The suboor
must be clean, level, smooth, dry, frost-free, solid, suitably weight-
bearing and dimensionally stable.
Screed layers used over the Warmup Forte should be chosen and
installed in line with building regulations and standards.
Install the oor sensor centrally between the two closest parallel
runs of pipe and away from other heat sources such as hot water
pipes, lighting xtures, chimneys etc.
Before installing the oor nish, its suitability for use with
underoor heating and its maximum operating temperature
should be checked against required operating conditions. Ensure
the heat output of the oor meets your requirements.
Ensure adhesives, grouts, glues and screeds used are compatible
with underoor heating.
Underoor heating performs the most eciently with conductive,
low resistance oor nishes such as stone and tiles. Consideration
should be given to the thermal resistance and temperature limits
of the chosen oor covering and its impact on the system heat
output�
It is recommended that all furniture installed over underoor
heating has feet, maintaining a minimum 50 mm ventilated space
above the oor to allow heat ow into the room.
DO NOT switch on the heating system until the screed layer
has fully cured.
DO NOT use steel rebar tie wire to secure the pipe to the suboor.
Only use cable ties supplied with the product or an equivalent
specication.
Bekijk gratis de handleiding van Warmup Forte, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Warmup |
| Model | Forte |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 7895 MB |