Step 3 - Lay the pipe
It is recommended to use the spiral pattern to achieve an even surface
temperature and high heat output.
The rst loop should be laid around the perimeter of the room, then
working inwards towards the centre at double the intended pipe
spacings, securing to the reinforcement mesh with cable ties at 500mm
intervals�
Once you reach the centre, work back out, completing the spiral at the
intended pipe spacing.
For the pipe bends, secure the pipe to the reinforcement mesh using
cable ties at the beginning and end of each bend.
4B
4A
Beginning from the manifold location, following the projects working
drawings, begin laying the pipe, maintaining a gap of half the design pipe
spacing around the perimeter of the room.
Where it is not practical to use the spiral pattern, a double meander
pattern can be used, providing a more even surface temperature and
higher heat output than a single meander pattern.
The pipe should be laid referring to the working drawings, alternating
the rst run between 3 times and 1 times the design pipe spacing, before
working back to the manifold location, securing to the reinforcement
mesh with cable ties at approximately 500 mm intervals
For the pipe bends, secure the pipe to the reinforcement mesh using
cable ties at the beginning, middle and end of each bend.