Step 2 - Suboor preparation
Lay a damp proof membrane
over the suboor to prevent
water ingress.
Lay insulation board over
the membrane referring to
manufacturer instructions and in
line with building regulations
Ensure the insulation board is
pressed against the perimeter
strip�
Fold the polyethylene skirt over
the vapour control layer and tape
into position�
Install perimeter strip around the
perimeter of the room to allow for
dierential movement between
nished oor level and walls.
Tape the perimeter strip to the
wall to hold in position.
Lay a vapour control layer over
the insulation to prevent moisture
ingress.
The suboor must be clean,
solid, structurally sound and
dimensionally stable. Ensure the
suboor is prepared to an SR2
standard (SR2 - the maximum
permissible departure over a 2 m
straight edge is 5 mm).
If necessary a blinding layer
should be applied.
1 2
4
6
3
5
Ensure the perimeter strip is
installed with the integrated
polyethylene skirt facing out
from the wall.