Vivolink VLVWIP2000-CTL handleiding
Handleiding
Je bekijkt pagina 12 van 44

6.2 1U Rack Mounting
This Controller also can be mounted in a standard 1U rack (up to 4 units can
be installed horizontally). The mounting steps are as follows:
Step 1: Stack two Controllers on top of each other, then use included screws
to fix two 1U rack panels on the Controllers, as shown in the figure below:
6 /37
Step 2: Fix two 1U rack panels on another two stacked Controllers in the
same way, then use screws to fix two 1U rack panels together, as shown
in the figure below:
Step 3: Fasten screws between two 1U rack panels, so that four Controllers
are mounted in a 1U rack, as shown in the figure below:
JPEG2000 AVoIP Controller
Bekijk gratis de handleiding van Vivolink VLVWIP2000-CTL, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Vivolink |
Model | VLVWIP2000-CTL |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 4456 MB |