Vevor YZQ-6L handleiding

96 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 6 van 96
- 5 -
wooden blocks and screws to mount feet of base.
3. Threaded Rod Assembly (8), then mount to the Base (13). NOTE the threaded
rod is with two small pieces, should assemble first.
4. The base of the press should be screwed to a firm, solid floor or base, using the
holes in the feet. (screw not included)
5. Put the Juice Bag (9), containing the chopped fruit, into the wooden
barrel and hanging over the sides. Press down the fruit by hand.
Harder fruits-apples, pears, etc., should be cut into small pieces and ideally
crushed using a fruit crusher or shredder before placing in the bag.
Attention:smooth
edge contact the
base

Bekijk gratis de handleiding van Vevor YZQ-6L, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkVevor
ModelYZQ-6L
CategorieNiet gecategoriseerd
TaalNederlands
Grootte13557 MB