Vevor JZ-DD150 handleiding
Handleiding
Je bekijkt pagina 5 van 81

- 4 -
5. Safety training: Safety training for electric lifting platform operators to
understand the operating principles and precautions of the equipment to
master the correct operation methods.
6. Distress measures: In the event of an emergency, correct emergency
measures should be taken, such as distress stop, emergency power cut off,
etc., to ensure the safety of personnel and equipment.
7. Remote battery: The remote control battery needs to be purchased by
itself. The applicable model is 23A/12V, and the size is 28 mm X 10 mm.
Operation introduction
1.Connect power cables as shown in the figure
Cable remote control wiring is shown below
Bekijk gratis de handleiding van Vevor JZ-DD150, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Vevor |
| Model | JZ-DD150 |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 10065 MB |







