Vestil VST-4-Y handleiding
Handleiding
Je bekijkt pagina 6 van 10

TABLE OF CONTENTS Rev. 4/22/2022 VST-4-Y, MANUAL
TABLE OF CONTENTS Copyright 2021 Vestil Manufacturing Corp. Page 6 of 10
c. Align handrail tubes with handrail posts as shown below. Install a 3/8”-16 x 1.25” socket
cap screw (23307) through the bolt holes of aligned pipe ends (44-516-016) and wind
them into the lock nuts as shown in the diagrams below.
Handrail tubes with pipe ends Handrail tubes fastened to posts
d. Tighten all 4 socket cap screws to 15.7ft∙lb with your torque wrench.
e. Tighten all 8 set screws to 23ft∙lb.
3. Install the handrail stabilizer bar (14-017-041) with 5/16” hardware
a. Place the handrail stabilizer against the upper handrail posts. The top edge of the
stabilizer should contact the bottoms of the pipe ends.
b. Install the
5
/
16
”-18 x 1
1
/
8
” U-bolts (42024) around the handrail posts and through the bolt
holes provided at both ends of the stabilizer bar.
c. Install a 5/16” lock washer (33620) and a 5/16”-18 hex nut (36304) onto each arm of both
U-bolts. Tighten all 4 hex nuts to 8.8ft∙lb.
d. Install 5/16”-18 acorn nuts (37709) onto both legs of both U-bolts. Tighten each acorn nut
to 8.8ft∙lb.
Pipe end
Set screw
Lock nut Set screw
(37024) (73298)
Socket cap screw (23307)
Handrail stabilizer bar (14-017-041)
U-bolt Lock Hex Acorn
nut nut nut
Stabilizer
bar
Acorn
nut
Hex nut
Lock
nut
U-bolt
Handrail
tube
Bekijk gratis de handleiding van Vestil VST-4-Y, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Vestil |
Model | VST-4-Y |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 2451 MB |