Vestil LMS-EBT-46-4 handleiding

12 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 9 van 12
Table of Contents Rev. 9/25/2023 LMS, MANUAL
Table of Contents Copyright 2022 Vestil Manufacturing Co. Page 9 of 12
RECORD OF SATISFACTORY CONDITION
Record the condition of the lifting boom before putting it into service. Measure the length and width
of the shackle of both hooks. Include a width measurement of the mouth of the shackle, i.e. the area
that receives the shackle pin. Record your measurements. Measure the mouth of both hooks and
record the measurements. Thoroughly photograph the unit from multiple angles. Include close range
photos of all labeling, the shackles and shackle pins, the fork pockets/tubes, safety chain and its snap
hook and cold shut, support leg, and welds. Collate all photographs and writings into a single file. Mark
the file appropriately to identify it. The file provides a record of the device in satisfactory condition.
Compare the results of all INSPECTIONS (see p. 10) to this RECORD to determine whether the unit is in
satisfactory condition. If the boom is not in satisfactory condition, repair it before returning it to service.
Purely cosmetic changes, like damaged paint/powdercoat, do not constitute changes from
satisfactory condition. However, touchup paint should be applied to all affected areas as soon as
cosmetic damage occurs to prevent rusting and corrosion. If left unaddressed, rusting/corrosion will
alter the device from satisfactory condition and could make it unsafe to use.
LOAD TESTS
After creating a RECORD OF SATISFACTORY CONDITION and before using the boom for the first time, a
qualified person should conduct a load test. The test load should be 125% of the rated load (capacity)
of the lifter. For instance, if the rated load (capacity) is 1,000 lb. (454.5kg) the test load should be 1,250
pounds (568.2kg). Raise the load off of the ground until it is entirely suspended from the boom. Leave
the load suspended for a few minutes. Return it to the ground and unload it. Perform a MONTHLY
INSPECTION as described in the INSPECTIONS section (p. 10). The boom should undergo load testing
immediately after it is repaired, modified, or altered. Never modify the boom without first receiving
written approval from Vestil.

Bekijk gratis de handleiding van Vestil LMS-EBT-46-4, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkVestil
ModelLMS-EBT-46-4
CategorieNiet gecategoriseerd
TaalNederlands
Grootte3193 MB