Vestil LAD-FM-96 handleiding
Handleiding
Je bekijkt pagina 15 van 18

Table of Contents Rev. 11/30/2018 LAD-FM, MANUAL
Table of Contents Copyright 2017 Vestil Manufacturing Co. Page 15 of 18
Step 11: Attach the lower handrail posts to the roller brackets. Begin by inserting the bottoms of the detent pins
into the detent pin brackets. Put a
5
/
16
” flat washer onto a
3
/
8
” – 16 x 1
1
/
4
” bolt and insert the bolt through the
roller bracket bolt slot and bolt hole in the post mounting bracket. Secure each bolt with a
3
/
8
” – 16 lock nut.
Fasten the
3
/
8
”-16 bolt and nut as tightly as possible while still allowing the bolt to slide smoothly in the slot.
Step 12: Attach the roller brackets to the stairway side rails with
3
/
8
” hardware. Install
3
/
8
” – 16 x 2
1
/
2
” bolts
through the bolts holes (2) in the handrail mounting bracket and the bottom holes of the brackets. Secure the
bolts with
3
/
8
” – 16 lock nuts. When properly positioned, the lower handrail posts are perpendicular to the side
rails.
Roller bracket
(right side)
Side
rail tab
Handrail mounting
bracket
3
/
8
” – 16 x 2
1
/
2
” bolt &
3
/
8
” – 16 lock nut
3
/
8
” – 16 x 2
1
/
2
” bolt &
3
/
8
” – 16 lock nut
Detent pin
3
/
8
” – 16 x 1
1
/
4
” bolt (from inside)
5
/
16
” flat washer
3
/
8
” – 16 lock nut
Tighten bolt and nut firmly, but bolt
must be able to slide in the slot.
Roller bracket, left side
Roller bracket, right side
Detent pin
bracket
Bolt slot
Left side roller
bracket
Detent
pin
Detent pin
bracket
Front view
Top view
Front view
Top view
Side
rail
3
/
8
” – 16 lock nut
5
/
16
” flat washer
3
/
8
” – 16 x 1
1
/
4
” bolt
Bekijk gratis de handleiding van Vestil LAD-FM-96, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Vestil |
Model | LAD-FM-96 |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 5125 MB |