Vestil JIB-FM-6 handleiding

12 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 8 van 12
TABLE OF CONTENTS Rev. 2/22/2024 JIB-FM, MANUAL
TABLE OF CONTENTS Copyright 2021 Vestil Manufacturing Co. Page 8 of 12
USING THE CRANE
Before using the crane for the first time, perform a BEFORE AND AFTER EACH USE inspection.
WARNING
Serious personal injury or death could result from improper use.
Only qualified, designated crane operators should use this device. The operating instructions in this
manual supplement safe (crane and hoist) operation techniques learned during your training program.
ALWAYS apply those techniques and conform to OSHA crane operation standards (29 CFR 1910.179).
Instruct all persons to remain at a safe distance during operation. All personnel not using the crane
should remain outside the operating area during use.
Tag the crane “Out of service” and notify your maintenance personnel if: 1) you observe any damage to
the anchor bolts or the foundation especially the concrete around the anchor bolts; 2) hear unusual noise
during use; 3) see warps, cracks, etc. of the boom, the mounting plate (base of the mast), the socket, or the
load hook or chain/cable.
FUNCTION TESTS
Verify that the jib operates normally by performing the tests below. If an issue is discovered, tag the
crane “Out of Service”. Restore the crane to normal operating condition before returning it to service.
1. Test the bearing: Rotate the boom in both directions. Make sure that the boom rotates smoothly. Listen
for unusual noises while the boom rotates. If the boom wobbles or is unusually noisy, remove the boom and
socket from the mast. Grease the bearing inside the socket. Reinstall the boom and socket on top of the
mast. If lubrication does not resolve the problem, the bearing might need to be replaced. Contact the
factory to discuss the problem and to order replacement parts.
2. Test the hoist and trolley according to the manufacturers’ instructions.
!
Step 4 [JIB-FM-40]: Attach the boom to the rear bracket of the socket using
3
/
4
hardware as
indicated in the diagrams below. Fasten bolts and nuts to 94ft∙lb. of torque. Then, apply the beam
clamps. Install
5
/
8
hardware through the clamps and secure them with lock washers and hex nuts.
Fasten bolts and nuts to 50-52ft∙lb. of torque. The clamps of both sides of the beam should equally
overlap the I-beam flange. Fill the remaining space under the mounting plate with grout. Allow the
grout to fully cure before placing the jib in service.
3
/
4
” flat washer
(33018)
3
/
4
lock washer
(33632)
3
/
4
-10 hex nut
(36116)
5
/
8
-11 x 2
1
/
2
” bolt
(12313)
5
/
8
lock washer
(33630)
5
/
8
-11 hex nut
(36114)
Rear bracket
Bolt
(12312)
Beam clamp
(28-516-081)
Lock
washer
(33630)
Hex nut
(36114)
Beam clamp
(28-516-081)
3
/
4
-10 x 2
1
/
2
bolt (13363)
Beam bracket

Bekijk gratis de handleiding van Vestil JIB-FM-6, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkVestil
ModelJIB-FM-6
CategorieNiet gecategoriseerd
TaalNederlands
Grootte2710 MB