4. Installation
WARNING:Installationmustonlybeperformedbyqualiedprofessionalswiththeappropriatecredentials
for all required tasks.
4.1 Pre-Shipment Planning
Prior to shipment of the equipment:
1. Ensure that your facility has an adequate foundation to support the equipment. Consider the
equipment weight, material weight, and torque when the equipment is operating.
2. Determine the appropriate anchoring method for the equipment.
3. Ensure that your facility entrances can accommodate the equipment.
4. Determine the equipment required to move the FLT, including vehicles and rigging. Allow only
qualiedprofessionalstooperatetheequipmentandmovetheFLT.
4.2 Inspection of Shipment
Upon receiving the equipment:
1. Ensure that all pieces of equipment are present and not damaged.
a. Report shipping damage to the carrier before the carrier leaves your facility. All claims must
beledbeforethecarrierleavestheunloadingsite.
b. Report any missing components immediately.
2. Remove shipping supports from the equipment (if present).
4.3 Installation Guidelines
NOTICE: The customer is responsible for evaluation and guarding of any open sides of the equipment.
NOTICE: All plumbing and wiring must meet or exceed all federal, state, and local codes/standards,
andmustbeinstalledbyqualiedpersonnel.
WARNING:Beforeuse,FLTmustbesecuredtooorusingfourholesinbottomofframe.Ifthecaster
package is installed on the FLT, the FLT unit should be lowered to the oor (casters raised) instead of
anchoring.
WARNING: The air regulator is pre-set to 43 PSI [2.96 bar] and cannot be adjusted to higher pressure.
Operating at a higher pressure can rupture airbag.
1. LeveltheFLT,thenanchorittotheoorusing(4)holesinbottomofframe.Ifthecasterpackage
isinstalledontheFLT,theFLTunitshouldbeloweredtotheoor(castersraised)insteadof
anchoring.
2. Ensure pneumatic hoses within the frame of the machine are secured to the frame (where possible)
and clear of the rotating bucket, pivot points, and/or any moving parts.
3. Connect air supply (50-100 PSI nominal; 3.45-6.89 bar) to ball valve.
4. Turn ball valve to open position to enable air pressure.
For information on installation and setup of major purchased components, refer to manufacturer
documentation.
Bekijk gratis de handleiding van Vestil AIR-THL, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Vestil |
Model | AIR-THL |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 3026 MB |