Vestil AHSN-6-15-16-VG handleiding
Handleiding
Je bekijkt pagina 23 van 26

Table of Contents Rev. 5/28/2025 AHSN, MANUAL
Table of Contents Copyright 2025 Vestil Manufacturing Co. Page 23 of 26
Connect the load to the hoist chain/cable, according to the instructions supplied with your hoist
and the method applied at your work site; then raise the load only as high as is necessary to position it.
Once the load is properly centered above the work location, lower the load until it is fully supported by
the ground or work surface and disconnect the load from the hoist. Return the crane and hoist to their
storage locations.
If you must move the load to a different location, return the load to the ground and disconnect it
from the hoist. Move the crane and load separately to the desired work location. Only use the crane to
lift loads.
FESTOON KIT (OPTION)
Item
Part no.
Description
Quantity
2
28-016-169
Hold down plate
2
3
28-145-002
I-beam clamp
4
4
42234
3
/
8
in. -16 x 1in. turned eye bolt
2
5
33008
3
/
8
in. zinc-plated flat washer
2
6
36106
3
/
8
in. -16 zinc-plated hex nut
2
7
37030
1
/
2
in. ā 13 nylon insert lock nut
4
8
11211
1
/
2
in. ā 13 x 2 in. HHCS zinc-plated bolt
4
9
33012
1
/
2
in. zinc-plated USS flat washer
8
10
45503
1
/
8
in. wire rope (1 in. longer than 1-
beam)
1
11
34785T4
Quick-grip wire rope clamp
2
12
CV200
Plastic cable tie
7
13
O-RING15
Metal ring
6
14
FCOIL 143-001
Coiled power cord
1
Bekijk gratis de handleiding van Vestil AHSN-6-15-16-VG, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Vestil |
Model | AHSN-6-15-16-VG |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 6579 MB |