Vestil AHA-2-10-12-ALO handleiding
Handleiding
Je bekijkt pagina 20 van 24

Table of Contents Rev. 12/9/2019 AHA MANUAL
Table of Contents Copyright 2019 Vestil Manufacturing Corp. Page 20 of 24
Step 7: Connect the casters to the legs.
Attach a caster to each caster bracket of each leg using the hardware shown in Diagrams 7A & 7B (diagrams
show standard casters). Raise the crane 8 to 10 inches off of the ground with a fork lift or hoist. Position a caster
underneath each foot as shown in the diagram below and fasten it to the caster mount bracket. Tighten
hardware to 15-20ft∙lb with a torque wrench.
Step 8: If you have a “Come-Along” kit used to adjust the height of the crane, install the cable loops before inserting
the uprights into the receivers (of the yokes). Twist the cable loops into an “8” and fold the top of the 8 over the bottom
part of the 8 (this will double loop the cable). Slide the doubled loop around the receiver and insert an upright.
3
3
3
/
8
in. zinc-
plated
lock washer
3
/
8
in. zinc-
plated
hex nut
Diagram 7B: Caster installation for 6,000 lb. capacity
models (AHA-6-#-#)
3
/
8
in. SAE zinc-
plated flat washer
3
/
8
in. SAE zinc-
plated
flat washer
Diagram 7A: Caster installation for 2,000 lb. and 4,000 lb.
capacity models (AHA-2-#-# and AHA-4-#-#)
3
/
8
in. -
16 x 1¼ in. HHCS
#2 zinc-plated bolt
3
/
8
in. -16 x 2
in.
HHCS #2 zinc-
plated bolt
3
/
8
in. SAE zinc-
plated flat washer
3
/
8
in. SAE zinc-
plated flat washer
3
/
8
in. zinc-
plated
hex nut
Adjustment pin
a. Slide doubled cable loop onto receiver of yoke.
b. Cable must wrap around yoke below both the
adjustment pin and threaded knob.
Upright
Yoke
Threaded
knob
Bekijk gratis de handleiding van Vestil AHA-2-10-12-ALO, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | Vestil |
Model | AHA-2-10-12-ALO |
Categorie | Niet gecategoriseerd |
Taal | Nederlands |
Grootte | 6717 MB |