Handleiding
Je bekijkt pagina 34 van 84

32
TRUE RESIDENTIAL
®
1
1. Place rubber washer over draft standard mounting holes.
2. Secure the draft standard to the cabinet with the screws provided.
3. Remove the draft cap and run the chill hose to the top of the draft
standard. Hook the hose onto the stainless tube to keep hose from
falling out (This hose will keep the draft standard cold).
4. Reinstall the draft cap.
5. Hook up the pressure regulator to the CO
2
tank. Using a adjustable
wrench make sure the nut is tight.
6. Place CO
2
tank in the unit using the black strap provided. To secure
the tank use one of the screws from the evaporator cover. Connect the
beer hose line from draft tower to tapper. NOTE: Make sure clamp is
on the hose prior to attaching.
2
3
4
5
6
INSTALLING DRAFT STANDARD AND HOOK UP (CONTINUED)
Bekijk gratis de handleiding van True TUF-24-L-SS-C, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | True |
| Model | TUF-24-L-SS-C |
| Categorie | Vriezer |
| Taal | Nederlands |
| Grootte | 18882 MB |







