True TBR84-RISZ1-L-S-GGG-1 handleiding

40 pagina's
PDF beschikbaar

Handleiding

Je bekijkt pagina 10 van 40
TBR
|
TDR SERIES www.truemfg.com
TEC_TM_043 | REV. F | EN03/2/2023 Page 10 of 40 P#803294
Cabinet Setup (cont.)
Draft Tower Installation
Procedure
1. Position the rubber washer (see fig. 1) over the mounting holes
in the cabinet countertop.
2. Thread the beer line connector (see fig. 2) to the draft arm.
See fig. 3.
3. Run the beer line through the hole and into the cabinet.
See fig. 4.
4. With the provided hardware, install the draft arm. See figs. 5
and 6.
5. Remove the top of the draft arm. See fig. 7a.
6. Insert the air hose [1” (25.4mm) plastic tube] into the draft arm.
See fig. 7b.
NOTE: Take care to not disturb the insulation.
7. Hook the air hose clip to the insulating sleeve at the top of the
draft arm. See fig. 8.
NOTE: The clip ensures the chill hose, which keeps the beer
faucet cold, remains correctly positioned.
8. Replace the top of the draft arm.
A B
Fig. 5. Ensure the rubber gasket is
between the countertop and draft
arm.
Fig. 6. Thread the handle onto the
beer draft arm.
Fig. 1. Draft arm components; draft
arm not shown.
Fig. 2. Be sure to insert the O-ring into
the beer line connector.
Fig. 3. Attach the beer line connector
to the draft arm.
Fig. 4. Run the line into the cabinet.
Fig. 7. Route the air hose through the draft tower from below.
Fig. 8. Hang the chill hose clip over the beer line.

Bekijk gratis de handleiding van True TBR84-RISZ1-L-S-GGG-1, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.

Productinformatie

MerkTrue
ModelTBR84-RISZ1-L-S-GGG-1
CategorieKoelkast
TaalNederlands
Grootte17148 MB