Handleiding
Je bekijkt pagina 12 van 40

TBR
|
TDR SERIES www.truemfg.com
TEC_TM_043 | REV. F | EN03/2/2023 Page 12 of 40 P#803294
Cabinet Setup (cont.)
Air Distributor Manifold & Distributor Cover
A 2-way air distributor manifold is included to allow a single CO₂
supply line to pressurize two kegs. The air distributor is located
behind the distributor cover. To access, lift the cover off the
manifold mounting bracket. See figs. 1 and 2.
WARNING – Contents under pressure. Take care
when handling filled CO tanks. If unfamiliar
with using CO tanks and/or regulators, seek
information from your local distributor or brewer
representative before proceeding.
Fig. 1. LIft the distributor cover.
Fig. 2. The 2-way distributor manifold.
CO & Keg Connections
NOTE: CO cylinders, regulators, and keg tappers are not
provided by TRUE.
Required Tools
Required tools include (but may not be limited to) the following:
• CO Cylinder
• Pressure Regulator
• Tapper
NOTE: Be sure to use hose clamps for all air and beer lines as
applicable.
Procedure
1. Attach a pressure regulator to your CO cylinder.
2. Connect the pressure regulator to the distributor manifold.
3. Connect the distributor manifold to your tapper(s).
4. Connect the draft tower beer line(s) to your tapper(s).
5. Attach the tapper(s) to your keg(s).
6. Open the pressure regulator valve and pressurize the system.
NOTE: It requires 1/2 lb (0.23 kg) of CO to dispense a half-
barrel of beer at 38˚F (3.3˚C) with 15 psi (1.03 bar) of pressure
on the barrel.
7. Engage your tapper(s)
8. Check all connection points for leaks. If the system leaks, verify
all fittings and clamps are tight and seal correctly.
Bekijk gratis de handleiding van True TBR84-PTSZ1-L-B-SSS-SSS-1, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
Merk | True |
Model | TBR84-PTSZ1-L-B-SSS-SSS-1 |
Categorie | Koelkast |
Taal | Nederlands |
Grootte | 17148 MB |