• The ground at the installation site must be compacted enough. Relative compaction of
the ground should be equal to or greater than 98%. Otherwise, take proper methods to
strengthen the ground.
5.3.2 Recommended Foundation Construction Plan
The following conditions must be fulfilled:
• The bottom of the foundation should be firm enough.
• The foundations must be suitable for the weight of the MV Station.
• The foundation should be higher than the pea gravel ground on site to prevent the rain
from damaging the base or penetrating into the MV Station.
• Sufficient cross-sectional area and depth of the foundation should be maintained. The
depth is designed according to local soil conditions.
• Cable route should be taken into account.
• The LV cable trench must have enough space for personnel to enter.
• Backfill after securing cable clamps and connecting cables.
Overall construction effect is shown below.
The foundation plan described in this chapter is for reference only.
No
Name Part source
A Foundation
Not in the scope of delivery
B Oil tray
C Pea gravel ground
D Platform
E Cable clamp
F Step
Backfill after securing cable clamps and connecting cables.
System Manual5 Mechanical Installation
26
Bekijk gratis de handleiding van Sungrow MVS9000-LV, stel vragen en lees de antwoorden op veelvoorkomende problemen, of gebruik onze assistent om sneller informatie in de handleiding te vinden of uitleg te krijgen over specifieke functies.
Productinformatie
| Merk | Sungrow |
| Model | MVS9000-LV |
| Categorie | Niet gecategoriseerd |
| Taal | Nederlands |
| Grootte | 8876 MB |