Secure the container hoisted before hoisting another one.
The MV Station should be hoisted by four top corner fittings as shown in the following
figure.
Figure 5-2 Hoisting from top fittings
Table 5-1 The Substation Hoisting Parameters
Item Requirement
Steel Length(L) 6.5 m
Steel Rope Qty. 4 pieces, the load of a single steel is not less than 30T.
5.2.3 Fastening of Connectors
Use slings with hooks or U-hooks to hoist the MV Station.
The lifting devices should be correctly connected to the MV Station.